In the past week, all of the kitchen equipment was installed (not necessarily hooked up); the flooring in the Welcome Gallery is almost fully installed; additional grading was done and the grass seed has been put down behind the building; and the railing on the ramp from the Meeting Room vestibule to the Meeting Room side door was installed.

Sandra Persichetti poses with the newly installed ovens!
Seeding beyond the courtyard being completed.
the ramp from vestibule to Meeting Room is now complete with rails.
The flooring is almost fully installed in the Welcome Gallery. View is from the Fellowship Hall.